Service Package 1:

 The production check-up



From hidden bottlenecks to measurable efficiency in 5 steps


Change begins with transparency. The Production Check-Up is a compact, highly targeted analysis designed specifically for mid-sized manufacturers. Together, we evaluate your current operations, uncover hidden waste at its source, and build an actionable roadmap to maximize production efficiency.


From undiscovered bottlenecks to measurable efficiency in 5 steps


Process & Timeline (approx. 4–5 project days)


 Phase 1: Preparation & Data Analysis (Desk Research / Off-Site)

  • Initial process review: Evaluation of bills of materials (BOMs) and routing sheets for two representative products (one standard item and one complex product).

Duration: approx. 0.5 project days



Phase 2: Alignment & Strategy Kick-Off (On-site or Remote)

  • Management briefing: Alignment meeting with executive management and key stakeholders to define core challenges and objectives.
  • Documentation: Audio recording of key sessions to ensure precise documentation and accurate report generation.


Duration: approx. 0.5 project days (flexible: on-site or via video call)



Phases 3 & 4: Practical Match, Gemba Walk & Employee Interviews


  • On-site comparison: Target-actual comparison of work plans in the production hall (material flow, waiting times, bottlenecks).
  • Worker survey: Structured conversations with employees on site to identify everyday obstacles.
  • Documentation oder Requirements Recording; Audio recording of the conversations for a complete evaluation.


Time required: 1.0 to 2.0 project days (on site)



Phase 5: Evaluation & Executive Presentation

  • Action plan: In-depth data analysis and development of concrete, prioritized optimization measures.
  • Executive briefing: Comprehensive on-site presentation to management, including an interactive Q&A session.


Duration: 1.0 project day (desk analysis) + 1.0 project day (on-site presentation)



Framework & Investment



Total duration: Approx. 4.0 to 5.0 project days


Additional expenses: Travel and accommodation expenses are billed transparently at actual cost.


Key Benefits & Deliverables


  • Objective external perspective: Uncovering rigid operational routines and hidden waste.


  • Actionable roadmap: Immediately implementable measures to reduce lead times and maximize efficiency.


  • Comprehensive documentation: Detailed summaries and insights from management briefings and shop-floor interviews.


  • High team buy-in: Early involvement fosters acceptance and motivates shop-floor teams to embrace change.



Request Production Check-Up